№- | Nazwa | I* | Numer części |
---|---|---|---|
010 | CONTROL UNIT HEAD-UP DISPLAY PART MUST BE CHECKED AFTER INSTALLATION FOR CURRENT FLASHWARE |
001 | A 205 900 01 19 |
020 | FILLISTER HD SCREW FASTENING, HEAD-UP DISPLAY 5X20 |
003 | A 006 990 43 12 |
040 | CONTROL UNIT SIGNAL ACQUISITION AND ACTUATION MODULE, FRONT SAM PART MUST BE CHECKED AFTER INSTALLATION FOR CURRENT FLASHWARE |
001 | A 205 900 67 22 |
040 | CONTROL UNIT SIGNAL ACQUISITION AND ACTUATION MODULE, FRONT SAM PART MUST BE CHECKED AFTER INSTALLATION FOR CURRENT FLASHWARE |
001 | A 205 900 68 22 |
045 | HEXALOBULAR BOLT CONTROL UNIT TO BRACKET M6X16 |
001 | N 000000 002349 |
060 | BRACKET SAM CONTROL UNIT |
001 | A 205 545 15 40 |
065 | NUT-AND-WASHER ASSEMBLY BRACKET MOUNTING M6 |
003 | N 000000 006037 |
070 | RELAY UNIT IN INSTRUMENT PANEL |
001 | A 205 906 72 00 |
100 | CONTROL UNIT PNEUMATIC SUSPENSION PART MUST BE CHECKED AFTER INSTALLATION FOR CURRENT FLASHWARE |
001 | A 222 900 98 11 |
120 | CONTROL UNIT PARK ASSIST WITH DAS4, MAKE SURE TO PERFORM THE FOLLOWING COMMAND WITH XENTRY DIAGNOSTICS PRIOR TO ORDERING: "REGISTER VEHICLE FOR ORDERIN G A PROGRAMMED KEY" OBSERVE WIS PART MUST BE CHECKED AFTER INSTALLATION FOR CURRENT FLASHWARE Zastąpiono przez: A 000 900 18 08 |
001 | A 000 900 47 10 |
120 | CONTROL UNIT PARK ASSIST PART MUST BE CHECKED AFTER INSTALLATION FOR CURRENT FLASHWARE |
001 | A 000 900 18 08 |
140 | CONTROL UNIT RADAR SENSORS PART MUST BE CHECKED AFTER INSTALLATION FOR CURRENT FLASHWARE |
001 | A 000 900 49 09 |
140 | CONTROL UNIT RADAR SENSORS ALSO ORDER: TERMINAL BLOCK 2 X A 001 546 99 41; CABLE TIE 5 X A 002 997 24 90 PART MUST BE CHECKED AFTER INSTALLATION FOR CURRENT FLASHWARE |
001 | A 000 900 51 09 |
160 | CONTROL UNIT DRIVETRAIN PART MUST BE CHECKED AFTER INSTALLATION FOR CURRENT FLASHWARE |
001 | A 205 900 77 05 |
170 | BRACKET FOR POWERTRAIN CONTROL UNIT |
001 | A 205 545 17 40 |
180 | HEXAGON NUT BRACKET TO BODY SHELL M6 |
002 | N 910112 006001 |
210 | VOLTAGE CONVERTER VOLTAGE TRANSFORMER THE OLD PART MUST NO LONGER BE INSTALLED Zastąpiono przez: A 205 905 34 14 |
001 | A 205 905 28 09 |
210 | VOLTAGE CONVERTER VOLTAGE TRANSFORMER |
001 | A 205 905 34 14 |
220 | HEXAGON NUT FASTENING, VOLTAGE CONVERTER M5 |
001 | N 910112 005000 |
220 | HEXAGON NUT FASTENING, VOLTAGE CONVERTER M6 |
001 | N 910112 006001 |
300 | CONTROL UNIT AIR CONDITIONER PART MUST BE CHECKED AFTER INSTALLATION FOR CURRENT FLASHWARE |
001 | A 205 900 69 23 |
330 | FUSE BOX INBOARD |
001 | A 205 540 28 50 |
335 | RELAY | 001 | A 003 542 18 19 |
340 | HEXAGON NUT MOUNTING, FUSE BOX M6 |
001 | N 910112 006001 |
400 | FUSE BOX A-PILLAR AT RIGHT, BOTTOM |
001 | A 222 540 22 50 |
405 | FUSE BOX PAN, TO A-PILLAR |
001 | A 222 540 31 50 |
405 | FUSE BOX PAN, TO A-PILLAR |
001 | A 213 540 30 38 |
410 | FUSE BOX | 001 | A 222 540 30 50 |
415 | FUSE BOX | 001 | A 222 540 29 50 |
415 | FUSE BOX | 001 | A 213 540 04 14 |
420 | FUSE LINK F-7.5-N;MINI |
002 | N 000000 007901 |
420 | FUSE LINK 7.5A;MINI |
002 | N 000000 004194 |
420 | FUSE LINK F-10-N;MINI |
004 | N 000000 007902 |
420 | FUSE LINK 10A;MINI |
004 | N 000000 004195 |
420 | FUSE LINK C-10-N;ATO |
002 | N 000000 007891 |
420 | FUSE LINK C-10;ATO |
002 | N 000000 004204 |
420 | FUSE LINK C-15-N;ATO |
003 | N 000000 007892 |
420 | FUSE LINK C-15;ATO |
003 | N 000000 004205 |
420 | FUSE LINK C-25-N;ATO |
001 | N 000000 007894 |
420 | FUSE LINK C-25;ATO |
001 | N 000000 004207 |
420 | FUSE LINK C-30-N;ATO |
010 | N 000000 007895 |
420 | FUSE LINK C-30;ATO |
010 | N 000000 004208 |
425 | FUSE LINK 6-POLE SK6-1 - 5 |
002 | N 000000 006465 |
425 | FUSE LINK 6-POLE SK6-1 - 7.5 |
001 | N 000000 006466 |
450 | BRACKET TOLL RECORDING CONTROL UNIT |
001 | A 205 827 00 14 |
460 | RETAINING CLIP TOLL RECORDING CONTROL UNIT |
001 | A 205 827 01 33 |
500 | CONTROL UNIT ACTIVE ENGINE MOUNTS ALSO ORDER: 1X N 000000 001548 |
001 | A 205 900 22 19 |
500 | CONTROL UNIT ACTIVE ENGINE MOUNTS |
001 | A 205 900 15 27 |
700 | CONTROL UNIT FUEL PUMP PART MUST BE CHECKED AFTER INSTALLATION FOR CURRENT FLASHWARE |
001 | A 000 900 35 05 |
700 | CONTROL UNIT FUEL PUMP PART MUST BE CHECKED AFTER INSTALLATION FOR CURRENT FLASHWARE |
001 | A 000 900 66 12 |
700 | CONTROL UNIT FUEL PUMP WITH DAS4, MAKE SURE TO PERFORM THE FOLLOWING COMMAND WITH XENTRY DIAGNOSTICS PRIOR TO ORDERING: "REGISTER VEHICLE FOR ORDERIN G A PROGRAMMED KEY" PART MUST BE CHECKED AFTER INSTALLATION FOR CURRENT FLASHWARE Zastąpiono przez: A 000 900 66 12 |
001 | A 000 900 33 10 |
700 | CONTROL UNIT FUEL PUMP PART MUST BE CHECKED AFTER INSTALLATION FOR CURRENT FLASHWARE |
001 | A 000 900 66 12 |
700 | CONTROL UNIT FUEL PUMP PART MUST BE CHECKED AFTER INSTALLATION FOR CURRENT FLASHWARE |
001 | A 000 900 70 10 |
710 | NUT CONTROL UNIT FIXTURE |
002 | A 000 990 36 62 |
740 | CONTROL UNIT DIRT DEFLECTION CAMERA PART MUST BE CHECKED AFTER INSTALLATION FOR CURRENT FLASHWARE |
001 | A 222 900 56 13 |
750 | HEXALOBULAR BOLT CONTROL UNIT FIXTURE M6X16 |
001 | N 000000 002349 |
770 | CONTROL UNIT HEAD AREA HEATING |
001 | A 217 900 09 00 |
780 | BRACKET CONTROL UNIT FIXTURE |
001 | A 238 545 07 00 |
790 | NUT BRACKET TO REAR PANEL |
002 | A 000 990 36 62 |
900 | RELAY PLUG POSITION: F |
001 | A 000 982 27 23 |
902 | FUSE LINK C-5;ATO |
NB | N 000000 004202 |
902 | FUSE LINK C-7.5;ATO |
NB | N 000000 004203 |
902 | FUSE LINK C-15;ATO |
NB | N 000000 004205 |
902 | FUSE LINK C-20;ATO |
NB | N 000000 004206 |
902 | FUSE LINK E-40;MAXI |
NB | N 000000 004215 |
902 | FUSE LINK E-50;MAXI |
NB | N 000000 004216 |
904 | PIN BUSHING HOUSING FUSE BOX; CONNECTOR: 6-PIN MCP2.8;F1/6*MF1 |
001 | A 037 545 37 28 |
904 | CLUTCH FUSE BOX; CONNECTOR: 6-PIN MCP2.8;F1/6*MF2 |
001 | A 037 545 36 28 |
904 | CLUTCH FUSE BOX; CONNECTOR: 6-PIN MCP2.8;F1/6*MF3 |
001 | A 037 545 35 28 |